Ivory Coast Presidency – Maintenance and Repair
Caverton was contracted by the Airforce of Ivory Coast for the 600hrs and Main Gearbox inspection of their AW139 helicopter, S/N 312904: AC Reg TU- VHY.
The helicopter had been grounded for over 2 months due to a snag developed just before the AFCON Tournament.
Caverton commenced the repair under three phases:
- Inspection phase
- Exportation & Overhaul phase
- Maintenance phase – Work is currently ongoing.
Client:
Ivory Coast Presidency
Date:
January, 2024